“Automated Resource Leveling and Scheduling at LAIKA” by Nowakowski, Peterson, Stringer and Aiello
Conference:
Type:
Entry Number: 32
Title:
- Automated Resource Leveling and Scheduling at LAIKA
Presenter(s)/Author(s):
Abstract:
To manage the ever-increasing complexity and collaboration in the creation of physical assets for LAIKA’s hybrid stopmotion/CG features, we developed an integrated browser-based workflow that enables automated resource leveling and scheduling in a centralized system that is accessible to the entire studio.