“Automated Resource Leveling and Scheduling at LAIKA” by Nowakowski, Peterson, Stringer and Aiello – ACM SIGGRAPH HISTORY ARCHIVES

“Automated Resource Leveling and Scheduling at LAIKA” by Nowakowski, Peterson, Stringer and Aiello

  • 2020 Talks: Nowakowski_Automated Resource Leveling and Scheduling at LAIKA

Conference:


Type(s):


Title:

    Automated Resource Leveling and Scheduling at LAIKA

Session/Category Title:

    Pipeline

Presenter(s)/Author(s):


Interest Area:


    Production & Animation and AI / Machine Learning

Entry Number:


    32

Abstract:


    To manage the ever-increasing complexity and collaboration in the creation of physical assets for LAIKA’s hybrid stopmotion/CG features, we developed an integrated browser-based workflow that enables automated resource leveling and scheduling in a centralized system that is accessible to the entire studio.

Keyword(s):



PDF:



ACM Digital Library Publication:



Overview Page:



Submit a story:

If you would like to submit a story about this presentation, please contact us: historyarchives@siggraph.org